Registration is now open
Practical Project Control Course for Planning Engineers
Ideal for Beginners in Project Control
Master the project control foundations, develop a cost and resource-loaded baseline, update the schedule and prepare progress reports in ONE course
We trained planning engineers of leading companies



- LEARN Basic & Advanced Primavera P6.
- UNDERSTAND the contract requirements and scope.
- DEVELOP cost and resource-loaded baseline schedule.
- CREATE resource histograms & cash flow.
- MONITOR progress with various project management indicators.
- PREPARE weekly and monthly progress reports.
- LEARN advanced Excel in project control context.
- CREATE a project control system and protocol for your company.
Why Practical Project Control has been so successful for engineers who don't have limited knowledge of project control
Learn the process integration
Learn the planning foundations, prepare a cost and resource loaded schedule, update the schedule, analyze the progress and prepare full reports in ONE course.
Master the process, not the software
This is the first step-by-step learning program that focuses on the problem you're trying to solve... specifically how to plan and control projects (not just how to use a Primavera tool).
Practical Content Only
The program is 100% practical. You will learn the tools and methods which are used to manage real-life projects.
Develop the mindset
This is a fully integrated program that teaches you how to think and act as a planner.
Learn the software in context
The program teaches you how to use Excel and PowerPoint software tools in project control context.
Career Growth
Gain the necessary knowledge and achieve results that can help you add value to the project.


- Class Schedule
- From 04-Apr-26 to 23-May-25 (total 28 hours)
- 8 Saturdays
- From 10 AM to 1:30 PM (UAE Time) / 6 AM to 9:30 AM (GMT)
- Certificate of completion
The curriculum
- Introduction to Project Control
- Planner’s Responsibilities
- The Fast Four
- Planner’s Software Skills
- Understand Contract Requirements
- Contract Documents
- High Level Scope and Milestones
- Tender Clarifications
- Responsibility Matrix
- Provisional Sum and Prime Cost
- Baseline Development - WBS & Activities
- Work breakdown Structure (WBS)
- Explicit and Implicit Activities
- Activity ID, Name and Duration
- Adding Activities
- Baseline Development - Relationships
- Soft and Hard Logic
- Redundant Logic
- Logic and Resources Driven Relationships
- Drivers
- Relationships Template
- Baseline Development - Scheduling
- CPM Network Behavior
- Line of Balance
- Milestones
- Constraints
- Calendar
- Schedule Engineering Activities
- Procurement and Long Lead Items
- Baseline Development - Finalization
- Finalize Schedule and Remove Negative Float
- Develop and Assign Activity Codes
- Schedule Quality Checklist Items
- Baseline Development – Cost and Resource Loading & Submission
- Calculate Quantities and Costs From BOQ
- Calculate Manpower Requirements
- Create and Assign Resources
- Resources Assignments and Histograms
- Consolidated Manpower Histogram
- Schedule Submission Narrative
- Schedule Update
- Introduction to Schedule Update
- Schedule Update in Primavera P6
- Managing Negative Total Float
- Earned Value Model
- Line of Balance in the Schedule Update
- Out of Sequence
- Managing Schedule Changes
- Review Schedule Delays
- Multiple Float Paths
- Progress Reporting
- Purpose of Progress Reports
- Progress Curve
- Key Performance Indicators (KPIs)
- Variance Analysis
- Dashboard
- Cash Flow
- Planned vs Actual % Chart
- Summary Schedule Update Layout in P6
- Top 5 Longest Paths Layout
- Look Ahead Programs
- QA/AC Report
- Risk Management Register
- Different Engineering Logs
- Compiling Full Submission Package
- Develop Recovery Measures
-
Correspondences and PowerPoint
- Contractual Correspondences
- PowerPoint in project control
- Prepare Progress Presentation



What will you get?
Basic and Advanced Primavera P6
Learn advanced functions and shortcuts to increase productivity and the accuracy of your results.
Advanced Excel in project control
Apply Conditional Formatting, Vlookups, Index & Match and so much more in planning context.
Baseline Preparation
Ste-by-step explanation on how to develop a complete cost and resource-loaded baseline program from scratch inside P6.
Progress reporting
Analyze performance and prepare comprehensive progress reports.
PowerPoint for project control
Learn key features of PowerPoint to make high quality presentations.
BONUS: Templates, formats and tools
Detailed formats that will save you a lot of time and effort.
Frequently asked questions (FAQ)
If you’re new to Project Control, I recommend taking my Free P6 Course on YouTube in order to prepare for this course.
The course is delivered live online via Zoom
You will have lifetime access to the recordings (as long as the recordings are hosted on the platform).
As the program is delivered live and it has limited seats to ensure better interaction and support, refunds are not available.
This course is designed for professionals who are ready to commit time and effort to apply what they learn and get real value from the material. Please review the course description carefully before enrolling to ensure it’s the right fit for you.
My focus is creating courses that benefit as many students as possible, Therefore, I deliver the course in group batches and am not currently offering one-on-one training.
Please email us at osama@smartpmtraining.com and we’d be happy to answer your question!

Osama Saad
Confusion, hard work, frustration and making many mistakes.
I once desperately needed someone to tell me, ‘Do this, then this.’ So after working in project controls since 2010 (with the scars to prove it) helping planners find a simpler way to manage projects has become something I genuinely enjoy.
But after teaching thousands of engineers, here is my ultimate goal.
Help you learn the core foundations and understand why we do everything the way it is done.
Teach a proven step-by-step process that is based on both science and logic.
Have the confidence and knowledge to engage in arguments and add value to your project.